Default Field Mappings

Touchstone uses a standard import template to import data from project schedules based on the schedule type (Open Plan, Microsoft Project, Primavera P6 XER, or Primavera P6 XML). This topic lists the default field mappings when files are uploaded to Touchstone.

The Field Type and Baseline columns list attributes that are associated with a field extracted from the source. They are used when the project file is scored.

Fields with an asterisk are calculated fields.
Touchstone Activity Field Microsoft Project Open Plan P6 XER P6 XML Loading Type Field Type Baseline
Activity Constraint PrimaryConstraint PrimaryConstraint cstr_type or APA.ActivityConstraint PrimaryConstraintType Normal
Activity Status APA.ActivityActivityStatus APA.ActivityActivityStatus status_code or APA.ActivityStatus Activity Status or Status Normal
Activity Type APAActivityType Type task_type or APAActivityType Activity Type or Type Normal
Activity Type Ex ActivityTypeEx ActivityTypeEx ActivityTypeEx ActivityTypeEx Normal
Actual Cost Tsk.ActualCost ACWPcum ActualCost ActualCost Actual Cost
Actual Duration Tsk.ActualDuration act_drtn_hr_cnt ActualDuration Actual Duration
Actual Finish Tsk.ActualFinish AFDATE act_end_date ActualFinishDate Normal
Actual Start Tsk.ActualStart ASDATE act_start_date ActualStartDate Actual
Actual Work Tsk.ActualWork ACWP_QTY act_wirk_qty ActualLaborUnits Actual Work
ACWPAC Tsk.ACWP ACWPcum ACWP ActualLaborCost Actual Cost
At Completion Duration total_drtn_hr_cnt AtCompletionDuration Spread Duration
Baseline Cost Baseline Cost Baseline Cost* Baseline Cost PlannedLaborCost Spread Cost Yes
Baseline Duration Baseline Duration B01~ORIG_DUR Baseline Duration PlannedDuration Spread Duration, Work Yes
Baseline Finish Baseline Finish BFDATE Baseline Finish PlannedFinishDate / FinishDate Spread Duration Yes
Baseline Project Time Now (Current project's time now) BaselineStatusDate Baseline activity's project time now / status date (Current project's time now) Normal
Baseline Start Baseline Start BSDATE Baseline Start PlannedStartDate / StartDate Spread Duration Yes
Baseline Work Baseline Work BAC_QTY Baseline Work PlannedLaborUnits Spread Work Yes
BCWPEV Tsk.BCWP BCWPcum BCWP (EV) BCWP Actual Cost
BCWSPV Tsk.BCWS BCWScum BCWS (PV) BCWS Actual (Spread for P6 XML) Cost
Budget Cost (Current Projected Cost) Budget Cost BACcum target_cost or Budget Cost PlannedLaborCost Spread Cost Yes
Calendar (represents activity calendar name. Empty if activity does not have a calendar) Calendar's Name Normal
CPI - Labor Units CPI - Labor Units* CPI - Labor Units* CPI - Labor Units CPI - Labor Units* Normal
Critical Tsk.IsCritical IsCritical IsCritical IsCritical Normal
Description Tsk.Name DESCRIPTION task_Name Name Normal
Duration Percent Complete DurationPercentComplete DurationPercentComplete DurationPercentComplete DurationPercentComplete Normal Percent
Duration Uncertainty Distribution DurationUncertaintyDistribution DSHAPE Duration Uncertainty Distribution* Duration Uncertainty Distribution* Normal
EAC EAC EAC EAC AtCompletionLaborCost Spread Cost
Early Finish EarlyFinish EFDATE early_end_date EarlyFinishDate Normal
Early Start EarlyStart ESDATE early_start_date EarlyStartDate Normal
Earned Value Technique Earned Value Technique* Earned Value Technique Earned Value Technique Earned Value Technique* Normal
Earned Value Wor Earned Value Work* Earned Value Work* Earned Value Work EarnedValueLaborUnits Actual Work
Existence% Existence%* Existence % Existence%* Existence %* Normal Percent
ExpectedFinish ExpectedFinish* XFDATE expect_end_date ExpectedFinishDate Normal
External IsExternal Normal
External Early Start ExternalEarlyStart* ExternalEarlyStart* external_early_start_date ExternalEarlyStartDate Normal
External Late Finish ExternalLateFinish* ExternalLateFinish* external_late_end_date ExternalLateFinishDate Normal
Finish Finish Finish Finish FinishDate Normal
Free Float FreeFloat FREEFLOAT free_float_hr_cnt x 60 FreeFloat Normal Percent, Duration
ID Tsk.Id ACT_ID task_id Id Normal
Is Level Of Effort IsLevelOfEffort IsLevelOfEffort IsLevelOfEffort Type Normal (Actual for P6 XML)
Is Remaining Duration Elapsed IsRemainingDurationElapsed IsRemainingDurationElapsed IsRemainingDurationElapsed IsRemainingDurationElapsed* Remaining
LateFinish Tsk.LateFinish LFDATE late_end_date LateFinishDate Normal
LateStart Tsk.LateStart LSDATE late_start_date LateStartDate Normal
Longest Path Tsk.IsCritical IsLongestPath driving_path_flag IsLongestPath Normal
Max Duration MaxDuration DHIGH Max Duration* MaximumDuration Remaining Duration
Maximum Lag MaximumLag MaximumLag MaximumLag MaximumLag Normal
Mean Duration MeanDuration Mean Duration Mean Duration* Mean Duration* Remaining Duration
Min Duration MinDuration DLOW Min Duration* MinimumDuration Remaining Duration
Minimum Lag MinimumLag MinimumLag MinimumLag MinimumLag Normal
Most Likely Duration ModeDuration Most Likely Duration Mode Duration* MostLikelyDuration Remaining Duration
Number Of FF Predecessors NumberOfFFPredecessors NumberOfFFPredecessors NumberOfFFPredecessors NumberOfFFPredecessors Normal
Number Of FF Successors NumberOfFFSuccessors NumberOfFFSuccessors NumberOfFFSuccessors NumberOfFFSuccessors Normal
Number Of FS Predecessors NumberOfFSPredecessors NumberOfFSPredecessors NumberOfFSPredecessors NumberOfFSPredecessors Normal
Number Of FS Successors NumberOfFSSuccessors NumberOfFSSuccessors NumberOfFSSuccessors NumberOfFSSuccessors Normal
Number Of Lags NumberOfLags NumberOfLags NumberOfLags NumberOfLags Normal
Number Of Leads NumberOfLeads NumberOfLeads NumberOfLeads NumberOfLeads Normal
Number Of Predecessors NumberOfPredecessors NumberOfPredecessors NumberOfPredecessors NumberOfPredecessors Normal
Number of Resource Assignments COUNT(ResourceAssignments) COUNT(ResourceAssignments) COUNT(ResourceAssignments) COUNT(ResourceAssignments) Normal
Number Of SF Predecessors NumberOfSFPredecessors NumberOfSFPredecessors NumberOfSFPredecessors NumberOfSFPredecessors Normal
Number Of SF Successors NumberOfSFSuccessors NumberOfSFSuccessors NumberOfSFSuccessors NumberOfSFSuccessors Normal
Number Of SS Predecessors NumberOfSSPredecessors NumberOfSSPredecessors NumberOfSSPredecessors NumberOfSSPredecessors Normal
Number Of SS Successors NumberOfSSSuccessors NumberOfSSSuccessors NumberOfSSSuccessors NumberOfSSSuccessors Normal
Number Of Successors NumberOfSuccessors NumberOfSuccessors NumberOfSuccessors NumberOfSuccessors Normal
Original Duration OriginalDuration* ORIG_DUR target_drtn_hr_cnt x 60 PlannedDuration Spread Duration
Outline Level OutlineLevel OutlineLevel* Outline Level* OutlineLevel* Normal
Percent Complete PercentComplete Progress_Percent Percent Complete PercentComplete Normal Percent
Percent Complete Type PercentCompleteType PercentCompleteType* complete_pct_type PercentCompleteType Normal
Physical % Complete PhysicalPercentComplete* PPC phys_complete_pct PhysicalPercentComplete Normal Percent
Planned Value Work Planned Value Work* Planned Value Work* Planned Value Work Planned Value Work* Actual Work
Primary Constraint PrimaryConstraint PrimaryConstraint cstr_type PrimaryConstraintType Normal
Primary Constraint Date Tsk.ConstraintDate PrimaryConstraintDate cstr_date PrimaryConstraintDate Normal
Project Project Project's Original Name proj_short_name Project's Original Name Normal
Project Time Now StatusDate StatusDate StatusDate DataDate Normal
Remaining Cost Tsk.RemainingCost ETC RemainingCost RemainingCost Remaining Cost
Remaining Duration Tsk.RemainingDuration RemainingDuration remain_drtn_hr_cnt x 60 RemainingDuration Normal Duration
Remaining Earned Work Remaining Earned Work* Remaining Earned Work* Remaining Earned Work Remaining Earned Work* Remaining Work
Remaining Work Remaining Work* ETC_QTY remain_work_qty_ x 60 RemainingLaborUnits Remaining Work
ResumeDate Tsk.Resume ResumeDate* resume_date ResumeDate Normal
Schedule % Complete Schedule % Complete* Schedule % Complete* sched_complete_pct SchedulePercentComplete Normal Percent
Secondary Constraint Secondary Constraint* SecondaryConstraint cstr_type2 SecondaryConstraintType Normal
Secondary Constraint Date Secondary Constraint Date* SecondaryConstraintDate cstr_date2 SecondaryConstraintDate Normal
SPI - Labor Units SPI - Labor Units* SPI - Labor Units* SPI - Labor Units SPI - Labor Units* Normal
Start Start Start Start StartDate Normal
Start Percentage Start Percentage* STARTPC Start Percentage Start Percentage* Normal Percent
Status Status Status Status Status Normal
Sub-Project APA.SubProject Sub-Project* Sub-Project* Sub-Project* Normal
SuspendDate Tsk.Stop SuspendDate* suspend_date SuspendDate Normal
Total Cost TotalCost TotalCost TotalCost TotalCost Spread Cost
Total Duration TotalDuration TotalDuration TotalDuration TotalDuration Normal Duration
Total Float TotalFloat TOTALFLOAT total_float_hr_cnt TotalFloat Normal Percent, Duration
Total Work Work* Total Work* total_work_qty AtCompletionLaborUnits Spread Work
Type Activity Type Normal
Units Percent Complete UnitsPercentComplete UnitsPercentComplete UnitsPercentComplete UnitsPercentComplete Normal Percent
Variance - BL Finish Date Variance - BL Finish Date* Variance - BL Finish Date* Variance - BL Finish Date FinishDateVariance Spread Duration
Variance - BL Start Date Variance - BL Start Date* Variance - BL Start Date* Variance - BL Start Date StartDateVariance Spread Duration
WBS WBS WBS WBS WBSObjectId Normal
WBS Code WBS [BK3 file does not have a WBS Code] WBS WBSCode Normal
WBS Level Computed WBS object's level based on WBS structure Computed WBS object's level based on WBS structure Computed WBS object's level based on WBS structure Computed WBS object's level based on WBS structure Normal
WBS Name WBS [BK3 file does not have a WBS Name] wbs_name WBSName Normal